Connection Manager
- Last updated
- Save as PDF
The project level Connection Manager tool is designed to manage connections between your project and other projects in Procore, so that drawings can sync between the projects.
- Share current data with approved collaborators.
- Eliminate the need for collaborators to perform duplicative data entry in their own Procore account.
- Retain data in each company's account for record keeping and reporting.
Popular Tutorials (view all)
Brak pozycji odpowiadających Twojemu zapytaniu.
Upstream Account |
Wskazówka
Aby przeglądać i przeszukiwać wszystkie filmy szkoleniowe Procore, odwiedź naszą bibliotekę filmów.
Important
Action | None | Read Only | Standard | Admin | Notes |
---|---|---|---|---|---|
Approve or Reject Project Connection Request |
![]() ![]() ![]() |
||||
Configure Advanced Settings |
|
![]() ![]() ![]() |
|||
Disconnect a Connected Project |
![]() ![]() ![]() |
||||
Initiate a Request to Connect Projects |
|
Users must also have ‘Read only’ level permissions or higher to the Drawings tool in both the upstream and downstream projects. | |||
View Project Connections |
![]() ![]() ![]() |
![]() ![]() ![]() |
![]() ![]() ![]() |
Connectability for Drawings is Generally Available (10/22/2024)
The connection of drawings in the Drawings tool across different Procore company accounts using the Connection Manager is now generally available. To learn more about connecting drawings, see About Connectability.
Settings for Connection Manager Tool (02/21/2024)
The Connection Manager is a new tool that will allow you to connect your project to another company's project in Procore. Initially, you can set your connection settings and distribution list. See Configure Project Connection Settings, Configure Advanced Settings: Connection Manager, and About Connectability.